BU24P DeLonghi Miscellaneous - Instructions
Jump to:
Keep searches simple. Use keywords, e.g. "leaking", "pump", "broken" or "fit".
- Customer:
- John from MACON, GA
- Parts Used:
- 511741
- Difficulty Level:
- Really Easy
- Total Repair Time:
- 15 - 30 mins
- Tools:
- Pliers, Screw drivers
Rocker Switch wore out after 20 + years.
One phillips head screws, remove. Take cover off and flip over. Pull of six electrical leads from switch posts with needle nose pliers. Remove switch by pinching in both side release plastic hinges. May be tricky, may need needle nose pliers here. Replace switch from manifold front side. Install switch dots down facing wheels. Reattached leads, fasten back manifold with screw. Your ready.
Was this instruction helpful to you?
Thank you for voting!